STN EN 81-72
Name: | STN EN 81-72 |
Validity: | Withdrawn |
Number of pages: | 48 |
Language: |
EN
Pripravuje sa preklad do slovenského jazyka. Pre viac informácií nás kontaktujte na navrhynoriem@normoff.gov.sk
|
Paper: | 18,90€ |
Electronic version |
a) Only read (without ability to print and copy)
17,01€ b) Without ability to print, with ability to copy (printscreen) 18,90€ c) With ability to print and copy (printscreen) 24,57€ |
Slovak title | Bezpečnostné pravidlá na konštrukciu a montáž výťahov. Osobitné úpravy výťahov určených na dopravu osôb alebo osôb a nákladov. Časť 72: Požiarne výťahy |
English title | Safety rules for the construction and installation of lifts - Particular applications for passenger and goods passenger lifts - Part 72: Firefighters lifts |
Release Date: | 01. 01. 2021 |
Date of withdrawal: | 01. 10. 2024 |
ICS: | 91.140.90 |
Sorting character/National clasification code | 27 4003 |
Level of incorporation: | idt EN 81-72:2020 |
Official Journal | 12/20 |
Amendments | |
Replaced by: | STN EN 81-72:2024-10 (27 4003) |
Repleces: | STN EN 81-72:2016-01 (27 4003) |
Note in Official Journal: | |
Subject of the standard: | 1.1 This document specifies the additional or deviating requirements to EN 81-20:2020 for new passenger and goods passenger lifts, which can be used for firefighting and evacuation purposes under firefighters control. 1.2 This document applies, when the following conditions are fulfilled: - the lift well and the lift environment are designed to restrict the ingress of fire, heat and smoke to the lift well, machinery spaces and safe areas; - the building design limits the flow of water into the lift well; - the firefighters lift is not used as an escape route; - the lift well and the lift environment are fire protected for at least to the same level as the building structure; - the power supply is secure and reliable; - the electrical cable(s) providing power to the lift is fire protected to the same fire protection level as given to the lift well structure; - a suitable maintenance and verification plan is implemented. |
Preview: | Náhľad normy (PDF) |