Official website

Doména gov.sk je oficálna

Toto je oficiálna webová stránka orgánu verejnej moci Slovenskej republiky. Oficiálne stránky využívajú najmä doménu gov.sk. Odkazy na jednotlivé webové sídla orgánov verejnej moci nájdete na tomto odkaze.

This page is secured

Buďte pozorní a vždy sa uistite, že zdieľate informácie iba cez zabezpečenú webovú stránku verejnej správy SR. Zabezpečená stránka vždy začína https:// pred názvom domény webového sídla.

  1. Home
  2. STN EN IEC 61970-452

STN EN IEC 61970-452

Back

Electronic version (pdc file)

Add to Cart
Name: STN EN IEC 61970-452
Validity: Valid
Number of pages: 282
Language:
EN
Paper: 36,30€
Electronic version a) Only read (without ability to print and copy) 32,67€
b) Without ability to print, with ability to copy (printscreen) 36,30€
c) With ability to print and copy (printscreen) 47,19€
Slovak title Rozhranie aplikačného programu pre systémy riadenia elektrickej energie (EMS-API). Časť 452: Statické profily CIM prenosovej siete
English title Energy management system application program interface (EMS-API) - Part 452: CIM static transmission network model profiles
Release Date: 01. 02. 2022
Date of withdrawal:
ICS: 33.200
Sorting character/National clasification code 33 4621
Level of incorporation: idt IEC 61970-452:2021, idt EN IEC 61970-452:2021
Official Journal 01/22
Amendments
Replaced by:
Repleces: STN EN 61970-452:2018-05 (33 4621)
Note in Official Journal:
Subject of the standard: This document is one of the IEC 61970-450 to 499 series that, taken as a whole, defines at an abstract level the content and exchange mechanisms used for data transmitted between control centres and/or control centre components, such as power systems applications. The purpose of this document is to define the subset of classes, class attributes, and roles from the CIM necessary to execute state estimation and power flow applications. The North American Electric Reliability Council (NERC) Data Exchange Working Group (DEWG) Common Power System Modelling group (CPSM) produced the original data requirements, which are shown in Annex E. These requirements are based on prior industry practices for exchanging power system model data for use primarily in planning studies.
Preview: Náhľad normy (PDF)