STN EN IEC 61557-5
Name: | STN EN IEC 61557-5 |
Validity: | Withdrawn |
Number of pages: | 20 |
Language: |
EN
|
Paper: | 14,10€ |
Electronic version |
a) Only read (without ability to print and copy)
12,69€ b) Without ability to print, with ability to copy (printscreen) 14,10€ c) With ability to print and copy (printscreen) 18,33€ |
Slovak title | Elektrická bezpečnosť v nízkonapäťových rozvodových sieťach so striedavým napätím do 1 000 V a s jednosmerným napätím do 1 500 V. Zariadenia na skúšanie, meranie alebo sledovanie činnosti prostriedkov ochrany. Časť 5: Zemný odpor |
English title | Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 5: Resistance to earth |
Release Date: | 01. 03. 2022 |
Date of withdrawal: | 01. 05. 2023 |
ICS: | 17.220.20, 29.080.01, 29.240.01 |
Sorting character/National clasification code | 35 6230 |
Level of incorporation: | idt EN IEC 61557-5:2021, idt IEC 61557-5:2019 |
Official Journal | 02/22 |
Amendments | |
Replaced by: | STN EN IEC 61557-5:2023-05 (35 6230) |
Repleces: | STN EN 61557-5:2007-12 (35 6230) |
Note in Official Journal: | |
Subject of the standard: | IEC 61557-5:2019 specifies the requirements applicable to measuring equipment for measuring the resistance to earth using an AC voltage. IEC 61557-5:2019 cancels and replaces the second edition published in 2007. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: a) definitions and symbols in Clause 3 modified; b) subclauses in Clause 4 restructured and aligned with other parts of the series; c) limits for reduced voltages 25 V RMS or 35 V peak removed from 4.5; d) requirements for clamps added; e) marking for rated voltages to earth and measurement category added to Clause 5; f) warning about absence of hazardous voltage added in Clause 5; g) the term "percentage operating uncertainty" replaced by "operating uncertainty" in Clause 6; h) equation for uncertainty corrected in Table 1; i) new Annex A on test measurements with loop clamps added. |
Preview: | Náhľad normy (PDF) |