Official website

Doména gov.sk je oficálna

Toto je oficiálna webová stránka orgánu verejnej moci Slovenskej republiky. Oficiálne stránky využívajú najmä doménu gov.sk. Odkazy na jednotlivé webové sídla orgánov verejnej moci nájdete na tomto odkaze.

This page is secured

Buďte pozorní a vždy sa uistite, že zdieľate informácie iba cez zabezpečenú webovú stránku verejnej správy SR. Zabezpečená stránka vždy začína https:// pred názvom domény webového sídla.

  1. Home
  2. STN EN 50522

STN EN 50522

Back

Electronic version (pdc file)

Add to Cart
Name: STN EN 50522
Validity: Withdrawn
Number of pages: 80
Language:
EN
Paper: 28,80€
Electronic version a) Only read (without ability to print and copy) 25,92€
b) Without ability to print, with ability to copy (printscreen) 28,80€
c) With ability to print and copy (printscreen) 37,44€
Slovak title Uzemňovanie silnoprúdových inštalácií na striedavé napätia prevyšujúce 1 kV
English title Earthing of power installations exceeding 1 kV a.c.
Release Date: 01. 06. 2022
Date of withdrawal: 01. 03. 2023
ICS: 29.120.50
Sorting character/National clasification code 33 3201
Level of incorporation: idt EN 50522:2022
Official Journal 05/22
Amendments
Replaced by: STN EN 50522:2023-03 (33 3201)
Repleces: STN EN 50522:2011-08 (33 3201)
Note in Official Journal:
Subject of the standard: This document is applicable to specify the requirements for the design and erection of earthing systems of electrical installations, in systems with nominal voltage above 1 kV AC and nominal frequency up to and including 60 Hz, so as to provide safety and proper functioning for the use intended. NOTE 1 The technical and procedural principles of this document can be applied when 3rd parties’ installations and facilities are planned and/or erected in the vicinity of HV electrical power installations. For the purpose of interpreting this document, an electrical power installation is considered to be one of the following: a) substation, including substation for railway power supply; b) electrical power installations on mast, pole and tower; switchgear and/or transformers located outside a closed electrical operating area; c) one (or more) power station(s) located on a single site; the electrical power installation includes generators and transformers with all associated switchgear and all electrical auxiliary
Preview: Náhľad normy (PDF)