Official website

Doména gov.sk je oficálna

Toto je oficiálna webová stránka orgánu verejnej moci Slovenskej republiky. Oficiálne stránky využívajú najmä doménu gov.sk. Odkazy na jednotlivé webové sídla orgánov verejnej moci nájdete na tomto odkaze.

This page is secured

Buďte pozorní a vždy sa uistite, že zdieľate informácie iba cez zabezpečenú webovú stránku verejnej správy SR. Zabezpečená stránka vždy začína https:// pred názvom domény webového sídla.

  1. Home
  2. STN EN 12255-1

STN EN 12255-1

Back

Electronic version (pdc file)

Add to Cart
Name: STN EN 12255-1
Validity: Withdrawn
Number of pages: 32
Language:
EN
Pripravuje sa preklad do slovenského jazyka. Pre viac informácií nás kontaktujte na navrhynoriem@normoff.gov.sk
Paper: 17,20€
Electronic version a) Only read (without ability to print and copy) 15,48€
b) Without ability to print, with ability to copy (printscreen) 17,20€
c) With ability to print and copy (printscreen) 22,36€
Slovak title Čistiarne odpadových vôd. Časť 1: Všeobecné zásady navrhovania a výstavby
English title Wastewater treatment plants - Part 1: General design and construction principles
Release Date: 01. 02. 2025
Date of withdrawal: 01. 09. 2025
ICS: 13.060.30
Sorting character/National clasification code 75 6410
Level of incorporation: idt EN 12255-1:2024
Official Journal 01/25
Amendments
Replaced by: STN EN 12255-1:2025-09 (75 6410)
Repleces: STN EN 12255-1:2003-09 (75 6410)
Note in Official Journal:
Subject of the standard: This document specifies the basic design and construction requirements for wastewater treatment plants for over 50 PT. NOTE 1 Requirements for structures which are not specific for wastewater treatment plants are not within the scope of this document. Other ENs can apply. NOTE 2 Equipment which is not solely used in wastewater treatment plants is subject to the applicable product standards. However, specific requirements for such equipment when used in wastewater treatment plants are included in this part. NOTE 3 Although this document specifies the basic design and construction requirements for wastewater treatment plants for over 50 PT, many requirements are only technically and economically feasible at significantly larger sizes.
Preview: Náhľad normy (PDF)